Business challenge

PALO IT collaborated with Singapore Airlines (SIA) to deploy a cutting-edge, AI software engineering methodology for one of SIA’s digital product squads.

Through this collaboration, Generative AI’s transformative capability in digital product development was tested by this squad, and the positive results from this initial pilot has led to a plan to further test and scale this innovation to wider IT teams in SIA.

PALO IT solution

The pilot was centered on PALO IT's Gen-e2™ (Generative AI Enhanced Engineering) methodology, an approach that represents a paradigm shift in enterprise software development and reimagines the entire development life cycle as AI-first rather than AI-augmented.

This approach integrates GitHub Copilot deeply across every phase of a project to empower developers with an AI peer programmer, transforming the linear Software Development Life Cycle (SDLC) into a more streamlined Product Development Life Cycle (PDLC).

Outcomes

  • During the pilot, GitHub Copilot played a pivotal role in generating a significant proportion of the code. This contribution enabled the SIA digital product squad to successfully develop a website feature that was ready for user acceptance test in a much shorter time frame than initially planned.

    In addition to this accelerated pace, the squad also benefitted from a notable increase in code coverage and higher build success rate at earlier stage of the development, all made possible through the automation powered by Generative AI.

    SIngapore Airlines Burn-Up Chart
    Burn Up Chart of the Pilot Project: 5-week feature development using Gen-e2™ versus forecasted 9-week effort with traditional methods.

    SIngapore Airlines Timeline

    Build Success Rate jumped drastically to above 90% 3 weeks into the pilot, rate of increase is higher than that of traditional methods.

  • Results from the weekly survey have shown that the team's sentiment towards the new approach is positive and is effective in improving the team's software engineering practices. 

    These results demonstrate significant productivity gains while also highlighting the ease of adoption of the Gen-e2™ methodology, which is powered by GitHub Copilot.

  • This successful pilot with SIA is the result of a strong two-year partnership between PALO IT and GitHub to leverage Copilot’s capabilities to take software engineering to the next level by unleashing the full potential of AI in software engineering.

“Strategic partnerships are key as we extend the reach of GitHub’s Copilot-powered platform. We’re excited to deepen our partnership with PALO IT and enable more companies to unlock innovation at scale through AI-driven software development, just as we’ve seen with Singapore Airlines."

– Sharryn NAPIER, VP, APAC at GitHub

About Singapore Airlines

Founded in 1947, Singapore Airlines operates from its hub at Changi Airport. With a strong focus on customer satisfaction and a network of 76 destinations across five continents, the airline exemplifies excellence in the aviation industry, making it a proud partner in driving innovation and transformation in air travel.

Ready to elevate your software delivery with AI?

More client stories

Kickstarting AI adoption at JLL

A tailor-made AI training program for one of the world's largest real estate service companies

Driving practical, measurable AI adoption at scale

Upskilling 300+ Colissimo employees to boost speed, security and customer experience

Virgin Active membership migration & mobile innovation

Transforming user experience with AI while delivering 40% cost savings